Q2 2026 MARKET REPORT

Investment Prospectus: HUNTSMAN PETROCHEMICAL PORT ARTHUR FACILITY

Location: 4241 Savannah Ave, Port Arthur, TX, PORT ARTHUR

Suitability Index

Status: Prime Target

🌿

Annual Carbon Mitigation

2 Tonnes COâ‚‚e

Equivalent to removing 0 passenger vehicles from Texas roads annually.

Projected Annual Revenue

Based on 2024 tonnage reporting

Regional Feedstock Shed

637,119,883.9 Tons

Available within a 50-mile radius

Top Regional Feedstock Sources (50 mi)

Company Name Distance Annual Tonnage
SABINE RIVER OPERATIONS 16.5 Miles 312,018,334.8
BASF 7.1 Miles 94,529,000.4
INV NYLON CHEMICALS AMERICAS ORANGE SITE 16.5 Miles 93,176,834.5
INDORAMA VENTURES OXIDES PORT NECHES 5.1 Miles 44,461,788.0
USG PAPER ORANGE MILL 25.7 Miles 26,894,422.3

Site Logistics & Feedstock

SWR Number31907
CountyJEFFERSON
EPA IDTXD000820928

Investment Payback Velocity

Break Even
Year 0 (CAPEX) 454.8 Years Year 10 (Target)
Suitability Score: 88/100
Market Saturation Low (Saturated)

Market Comparison: Disposal vs. Recovery

Scenario Method Unit Cost/Value Annual Impact
Current Status Quo Hazardous Landfill -$68.00 / ton -$84
Proposed Method Chemical Recycling (Pyrolysis) +$820.00 / ton +$1,015
Total Annual Value Flip (ROI Opportunity) $1,099

Market Saturation (15 Mile Radius)

Company Name Distance (mi) Permit Type Suitability
Sabine Pass Remediation 9.0 miles Incineration 85%
Mid-County Resource Recovery 5.9 miles Recycling 78%